News from the construction site & the interface between the units

Dear all,

the construction is entering the final phase, with Unit 2 and Unit 1 reaching 80% of the final height.

Apart from the general photos, we would like to draw your attention to the photos of the joint between the units. In order to ensure that there is no interlocking between the units, after Unit 2 had been constructed up to 2.2m, the 30 cm wide strip of the surface was smoothed with a layer of mortar and left to dry over the weekend. Afterwards, the construction of Unit 1 alongside the interface has resumed.

 

 